Contacts
Address
United Kingdom, England, Crowle, RH109NT, Unit 3 Priestley Way Manor Royal
Director
Manager
Phones of enterprise
management
+44
When placing an order please inform the manager that you've learned the information on Allbiz! Thank you that you buy on Allbiz!
Internet
Site:
About enterprise
LK Systems, Ltd.
We are one of northern Europe's leading Heating & Plumbing suppliers; offering systems and products for under floor heating, plastic plumbing systems, radiator heating and drains.
In stock
Extendible manifold for heating and potable water systems with in-built isolation valve for each outlet port. It can be attached to the wall using the LK Manifold Bracket, or in LK Manifold Cabinet. Manufactured from dezincification resistant brass, plated
Manifold UNI 2-½"-Valve and 3-½"-Valve;...
Group: Boilers heating surfaces
In stock
Extendible manifold for heating and potable water systems. Attached to the wall in the LK Manifold Bracket, or in LK Manifold Cabinet. Manufactured from dezincification resistant brass, plated.
Manifold UNI 2-½", 3-½" and 4-½" have connections ¾" (male and female) for primary pipe and connection...
Group: Boilers heating surfaces
In stock
Used for cutting LK PAL Universal pipe in larger dimensions.
Note ! The pipe cutter must not be used for cutting metal pipes since the wheel blade is not intended for this material.
Group: Tools manual
In stock
For simultaneous chamfering and calibration of pipe end.
NOTE! chamfering is necessary to prevent the PressPex connection O-ring from being damaged when the pipe is inserted. The calibration tools fit in the drill chucks and other tools.
The calibration tool is intended for LK PAL Universal...
Group: Tools manual
In stock
Embedding in concrete with LK Clip-Rail 16/20
LK Clip-Rail 16/20 is used for installing in screed above floor insulation.
The clip-rail is fixed to the building insulation using plastic staples. The floor heating pipes are then simply and easily pressed into the clip-rail. The clip-rail holds the...
Group: Warm floor
In stock
LK Wood 22 is an eco-labelled sub flooring that is load bearing and designed for joists with centres between 400 mm and 600 mm. The Wood 22 replaces standard 22 mm sub flooring and is often installed at an early stage of construction and before the floor heating is installed.
Wood 22 is pre-routed...
Group: Warm floor
In stock
Delivered in cardboard tube packaging.
The pipes are normally delivered as whole packages with quantity/pack as described below. Additional tube delivery charges apply for split packs and single lengths. Length 3,2 m
Group: Polymer pipes
In stock
Pipe pre-assembled in conduit pipes of grey HD polythene. Coils supplied in cardboard packaging
Group: Tubes variuos
In stock
Electro-hydraulic battery machine18 V, 1,5 Ah for radial compression of LK >B<Press and LK PressPex type connections. Battery type Li-ion. Compression force from piston approx 15kN. 350º rotatable bayonet for swage. Machine weight approx 1.7 kg including battery.
Delivered in plastic case...
Group: Press-automatic devices